韩国美女毛片_成人吃奶视频_欧美日韩亚洲系列_国产一区在线视频观看_日日夜夜精品视频免费_天堂视频网

EN
The FGC system undertaken by HEPT of the waste incineration power generation upgrading project in Jinzhou, Shijiazhuang, Hebei Province, has started construction
2025.09.19
The FGC system undertaken by HEPT of the waste incineration power generation upgrading project in Jinzhou, Shijiazhuang, Hebei Province, has started construction since 5th. Aug 2025 and has been finished on 27th. Aug to pass the preliminary acceptance.
The total capa of this project is 1,000 tons per day and it will be implemented in two phases. The first-phase includes a 1×600t/d mechanical grate incinerator and waste heat boiler, as well as a 1×12MW extraction condensing steam turbine generator set. Currently, reserved space is available for the second-phase construction. The FGC system adopts the treatment process of "SNCR denitrification +PNCR denitrification +SDA denitrification + dry denitrification (slaked lime) + activated carbon injection adsorption + bag filter + GGH+SGH+SCR denitrification + fly ash transportation, storage and stabilization". The upgrading includes "SDA+ bag filter + fly ash conveying + fly ash re-Chelating + leachate re-injection + slurry conveying", which is an EPC project of HEPT. This technological transformation requires the completion of core equipment updates within a 28-day deadline. It is another major challenge for HEPT just two months after the completion of the project in Yibin, Sichuan. Once again it sets a new record for the completion during of technical upgrading in this industry!
Behind this seemingly unbelievable challenge lies the countless efforts and hard work of HEPT as well as the strong support provided by the two newly built plants, which are the Wuxi Manufacturing Center and the Xuancheng Manufacturing Center. To ensure the smooth progress of the progress, all staff of each manufacturing center have been fully committed to providing efforts and working overtime. From the overall processing and manufacturing of the equipment, to the fine grinding and then to the final painting process, every process has been strictly controlled and no defects are allowed. They are well aware that every component is related to the progress and quality of the project.
Another thing worth mentioning is that, with over 50 years of professional accumulation in the equipment manufacturing industry, HEPT has achieved a significant advantage in the on-site hoisting of large modules of equipment. Under the traditional mode, equipment may need to be spliced multiple times and fabricated and welded on site. This not only takes a lot of time and effort but also is prone to defects due to the lack of advanced processing equipment and quality inspection guarantees on site, which can affect the performance of the equipment and the construction period. This time, the two manufacturing centers of HEPT have completed the large module prefabrication and assembly inspection of the equipment in the plants. After ensuring everything was qualified, they directly transported it to the site for hoisting. This significantly shortened the construction period, improved the construction efficiency and also guaranteed the overall performance and stability of the equipment. As a result, HEPT has been able to steadily advance all its work under the huge pressure of the extremely short period of construction . Ultimately, the jobs were successfully completed, laying a solid foundation for the successful delivery of the project.
Facing numerous difficulties such as cross-operation of equipment and strict on-site construction conditions, HEPT staff have adopted an innovative model of "two-shift system + modular construction + factory prefabrication guarantee" to carry out 24-hour continuous operation. Meanwhile, the team also fully utilized BIM technology to optimize the layout. Through precise simulation and analysis, they have identified and resolved potential design defects in advance, saving precious time. It is precisely this spirit of continuous exploration and unremitting efforts that enabled the HEPT team to successfully complete the task within the originally scheduled schedule, setting a new record for technological transformation in the environmental protection industry with the astonishing "HEPT Speed".
The references of HEPT in Hebei Province include: Baoding Phase I, Phase II, Hengshui, Hengshui Anping, Dingzhou, Cangzhou Phase I, Shijiazhuang, Shijiazhuang Xiannengxin, Shijiazhuang Xingtang, Tangshan Caofeidian, Tangshan Luanzhou, Tangshan Fengrun, Tangshan Jiecheng, Tangshan Qian 'an, Chengde Weichang, Baoding Shunping, Tangshan Phase I&II, Chengde North of Zhangjiakou, Langfang Gu 'an, Langfang Xianghe, Langfang Sanhe, Xingtai Shahe, Xingtai Wei County, Xingtai Julu, Handan Wei County, etc.

For more information, please click or scan below!
Follow us!

主站蜘蛛池模板: 成年人视频免费网站 | 在线播放a | 亚洲欧美日韩激情 | 亚洲国产天堂 | 中文字幕在线视频免费观看 | 一二三在线视频 | 九九热av| 国产精品久久久久久一区二区三区 | 日韩成人精品在线 | 日韩不卡一区二区 | 欧美aaaaaaaaa | 福利二区视频 | 欧美日本中文字幕 | 精品毛片在线观看 | 韩国毛片网站 | 鲁大师在线高清在线播放免费观看 | 性天堂av | 亚洲欧美日韩国产精品 | 欧美xxxx黑人xyx性爽 | 日本日韩欧美 | 国产xxxx性hd极品 | 午夜亚洲视频 | 亚洲a在线观看 | 天天久久综合 | 一区二区三区有限公司 | 国产成人精品在线视频 | 最近2019中文字幕大全第二页 | 亚洲欧美在线观看 | 91狠狠干 | 天天拍夜夜拍 | 青青免费在线视频 | 91久久综合亚洲鲁鲁五月天 | 日韩高清不卡 | 尤物最新网址 | www.国产黄色| 欧美另类xxxx野战 | 中文字幕在线不卡 | 超碰97在线看 | 国产亚洲第一页 | 欧美激情婷婷 | 欧美日韩国产一级片 |